home

Construction of Greenhouse’s second level

Posted by Admin on 25 July, 2011

(click to view full size)

Seen here is Darryl carefully placing wood and glass blocks as part of the second floor of the greenhouse. The glass blocks are directly above the water blocks of the first level farm, and when the second floor’s water is placed you can see through it- just a fun little effect. I did complain a little that he didn’t bother finishing the walls of the first floor yet because it was me dealing with the spiders that kept coming in at night.